Work continues on the installation of the 2 large HVAC units. Hopefully that service will be restored in the coming week or two. We are grateful for the mild temperatures while we are without heat in the building. (As mentioned in a previous update, we do now have heat in the offices and bathrooms. These new units heat and cool the auditorium and upstairs classrooms.)
The carpet arrived on Friday morning and four men managed to get all of it
inside. The Bromley and Walton Brawn were on display. 🙂 Pictures are in the “Restoration” album.
Sound board was re-installed in the nursery.
The new wiring for the sound system was installed and the decking was placed back on the platform.
Cabinets are scheduled to arrive Monday, October 28th, between 12 noon and 4 PM. We would appreciate a group of men who could be at the church during that time frame to help us haul them in when they arrive. There will be small jobs that can be done during the time of waiting.
Although we had planned to be back in our building for services by Sunday, November 3, we now think that we will likely not make that time frame. We are now hopeful to have heat and carpet done by the following week, November 10th.
————————————————————–
More photos have been added to this album: