Check out the recent pictures that have been added!! 🙂
Many small and large projects were finished up this week.
The painting is complete.
The bathroom partitions are in and the other bathroom fixtures have all been re-installed.
The foyer tile is down.
Some wood trim has been installed.
Some decorations are back up.
All the light fixtures were cleaned and all the flat surfaces were dusted.
The downstairs windows and screens were cleaned.
More work was done on cleaning up the landscaping.
The shed was organized.
The nursery bathroom is set up again.
The water fountain was re-installed.
The utility sink was re-installed in the janitor’s closet.
The small sink in the kitchen was re-installed.
Switch and outlet plates were all re-installed.
Fire extinguishers were re-installed.
Wood trim was all stained and clear coated.
Shelves were added in the foyer closet and sprinkler room. Things were put away. 🙂
Lots of other general cleaning was done.
Bob K. built a harrow and has been attempting to break up the muck on the lawns.
Preparation for HVAC units was done.
A gas line valve was added so that we should be able to get the gas turned back on at the building. How nice it will be to have hot water available again.
A temporary door was added to the ladies room. Hooray! (There’s a picture of it in the “Restoration” photo album.)
In the coming week, we hope to receive our new HVAC units and to begin the installation. The carpet should also arrive by the end of the week and installation hopefully can begin.
Additional damage was found to the sound system wiring under the platform so we are hoping to get those repairs done this week as well.
On Monday, October 28th, all of our new nursery, bathroom, and kitchen cupboards are scheduled to be delivered so we will need to have a crew on hand to unload them and carry them inside. We may also schedule the delivery of our kitchen appliances for that same day.
Rinnai has donated a $2000.00 tankless water heater for in the janitor closet! What a blessing! That unit may be installed this week if we are able to get our new gas meter put in.
Over the next several weeks some of the landscape islands will be restored with new weed block and rock. Some other exterior improvements are also planned for the front of the building. This work will be led by a young man named Colton who is taking on this project to fulfill his community service requirements to become an Eagle Scout! We are blessed to have him volunteer to help us in this way!
Please be in prayer for the many details of the next few weeks.